4 BEDROOM FURNISHED STUDENT PROPERTY - GOING THROUGH RENOVATIONS
LIST OF THE CURRENT RENOVATIONS GOING THROUGH:
Kitchen
Install new wall tiles to base of wall units and splashback, including corner trims
Seal worktops to tiles using mould?resistant silicone
Make good kitchen walls and redecorate walls and ceiling with 2 coats of anti?mould paint
Make good, undercoat and gloss skirtings
Remove base unit kickboards, cut to correct length and reinstall with end trims and corner trims
Install new FD30 fire door with:
3 fire rated bearing hinges
Fire rated latch
Fire seals and door closer
Paint door white to match existing woodwork
Replace back door with UPVC half double glazed door with thumb turn euro cylinder
Bathroom
Install new riser rail in shower
Install new UPVC window
Replace boxing in with white UPVC cladding
Treat mould on walls and ceiling
Make good and redecorate with 2 coats of anti mould paint
Cut out and reseal all sanitaryware with anti mould silicone
Hallway and Landing
Install new newel post and spindles
Raise height of banister and handrail on landing to meet building regulations
Remove staircase to loft which does not meet building regulations
Install new loft hatch and stair type pull down loft ladder
Re secure door frame and install new letter plate to front door
Install 1 hour fireproof boarding to underside of stairs
Seal all joints and edges with intumescent sealant
Bedrooms
Install new internal doors to bedrooms
Undercoat and gloss doors in white
Back bedroom: install UPVC door and frame with opening window above
Install window restrictors
Install thumb turn euro cylinder
Whole Property
Redecorate property throughout with 2 coats of emulsion
Prepare and undercoat woodwork
Topcoat woodwork with white satinwood
EPC Rating: E